{}

Our Brands

Search FAQs
PCSS (PowerChute Serial Shutdown) Installation with PCBE or PCPE Installed

Issue:
What happens when I install PCSS on my computer with PCPE/PCBE still installed?

Product Line:
All Back-UPS models are supported except models with the BP, BF, BG, and BC prefixes. Smart-UPS models with prefixes SMT, SMX, SURTD, SRT, SMTL, SCL, SMC, and SRTL
including models SRC2KUXI, SRC3KUXI, and SRC3KUXIX709

Cause:
Before PCSS is installed on your computer, any existing PCPE/PCBE should be uninstalled. If you are not technical enough to uninstall this application, software developers have made it easy for you.

Resolution:
PCSS setup automatically detects, PCPE. Clicking "yes" will proceed with he uninstallation of an existing application.
notification in the presence of PCPE
 
PCSS setup automatically detects PCBE. Clicking "yes" will proceed with the uninstallation of an existing application.
notification when PCBE is detected
 

PowerChute Serial Shutdown is available to download.

https://www.se.com/us/en/product-range/137943580-powerchute-serial-shutdown

 

APC USA

Explore more
Range:
Your browser is out of date and has known security issues.

It also may not display all features of this website or other websites.

Please upgrade your browser to access all of the features of this website.

Latest version for Google Chrome, Mozilla Firefox or Microsoft Edgeis recommended for optimal functionality.